Here are the final stages of construction. Once again the old Plasticville delivers.
 The roof had some issues, I think due to shrinkage over the years. I was able to bodge a fit by shaving of a moulded on lip on one side and offering the other side up under it, worked like a charm. The white bit had to be painted but that was it.
|  | 
| Stained glass, I'll have to figure some decent internal lighting. | 
|  | 
| The door is too nice to be left static. | 
|  | 
| Cut down the middle and glued in an open position. I think church doors are mean to be open. Porch needed a floor, plastic sheet with brick paper. | 
|  | 
| I added an internal door graphic, dunno why, no-one will ever see it! | 
|  | 
| Seams blocked with Plasticine to prevent light leakage | 
|  | 
| The finished article St Griswold's. | 


No comments:
Post a Comment